Does contact cement need to be completely dry before applying the tiles?
Yes, contact cement needs to be 100% dry before applying the tiles. It is recommended to apply a uniform, generous coat of adhesive to both surfaces with a nylon brush, roller (texturing type), or spray. One coat is typically enough for most surfaces