What is acceptable moisture content of the subfloor for floating cork flooring?
Requirements for concrete subfloors (after curing a minimum of 30 days for floating floor and 60 days for glue-down flooring):
-Note: a minimum 6 mil polyethylene sheet (vapor barrier) should always be applied under cork floating floor below grade. The same vapor barrier is recommended for on-grade applications or over concrete poured within 90 days.
Method 1 (preferred): Less than 75% RH using in-situ probe (ASTM F2170)
Method 2 (second choice): Less than 3 lbs/1,000 sq ft/24 hrs using MVER test (ASTM F1869)
Method 3 (lowest preference): Less than 4.5% using a moisture meter.
For Wood subfloors (plywood/OSB):
6%–9% moisture content (must be within 2% of cork flooring’s moisture content)
Related Articles
Do you have any installation instructions for floating flooring?
We do have installation instructions for our cork floating flooring. PDF: Floating Cork Flooring Installation Instructions If you still have questions, our team is happy to help!
Is cork flooring suitable for a concrete basement slab?
Yes, cork flooring can be used effectively in a basement setting with a moisture barrier. Concrete basement slabs are prone to moisture migration, which can damage the flooring when a moisture barrier is not installed. For glue-down flooring, we ...
Can I install cork flooring over radiant heat?
Cork can be installed over radiant heat; however, several factors should be considered. Cork flooring is insulating, so cork flooring will not get as warm as quickly as other flooring, like porcelain tiles. Radiant flooring under cork should never be ...
Do you have installation instructions for glue-down flooring?
We have PDF installation instructions and a video on installing glue-down flooring! Watch: Glue-down Cork Flooring Instructions Read: PDF Glue-down Cork Flooring Instructions If you have any questions on installation, our team is happy to help!
How long should cork wall and floor tiles acclimatize before installation?
We recommend letting all cork products acclimatize for at least 72 hours before beginning installation. Skipping this step can cause negative results after installation, as the humidity of the cork tiles adjusts to the humidity and temperature in the ...